Turn off water supply leading to work area & drain water from system. Squarely cut tubing or pipe to desired length and de-burr stub-out. Remove safety clip from valve collar. Mark stub-out ¾” from end, firmly push on valve to ensure it is seated in place and collar has met mark. Install safety clip back on to valve collar. Safety clip must always remain on valve collar when in use. Position valve outlet to receive supply line or tube. Attach supply line to valve or place nut and sleeve on supply tube. Tighten compression nut to valve securely. Turn off the water supply, drain water from system, remove safety clip, pull collar towards valve body as you remove from stub out. Replace safety clip.
TrustPilot
1天前
1 周前