Minimum Seismic Design Loads for Structures Quick-Card Based on ASCE 7-22
A**A
Wrong information on Ie
Importance factor data for seismic is incorrect. What was printed is for the snow not for seismic
TrustPilot
安妮塔· G.
2 个月前
阿卜杜拉·B.
3 周前
关税和税费包括
30天对于 PRO 会员用户
15天无会员资格
Anjali K.
1 个月前
Rajesh P.
2天前